Locked before the data is
Sign-off happens ahead of database lock, closing the door on post-hoc changes to methods once results are visible — the same discipline established in the original SAP development.
What's included
Sign-off happens ahead of database lock, closing the door on post-hoc changes to methods once results are visible — the same discipline established in the original SAP development.
Programming for TLF production and drafting for the CSR both work from this single signed-off version.